Inspection protocol

Four stages from component check to electrical stress test

01

Raw component verification

Incoming power modules, controllers, and connectors are checked against specification before entering assembly.

02

Systematic assembly

Units are built to a documented sequence, with torque, wiring, and enclosure fitting recorded at each step.

03

Electrical performance testing

Each charging station is run through electrical checks to confirm output behaviour and protective functions.

04

Final stress testing

Completed units undergo extended operating tests before release, so shipments leave verified and ready to install.

Export readiness

Built for durability, protection, and safe transit

Hardware, enclosures, and packing are prepared for long-term outdoor and commercial use and for containerized international shipment.

Environmental durability

Components are selected and tested for stable operation across the temperature and humidity ranges typical of commercial charging sites.

Enclosure protection

Housings are assembled to protect internal electronics from dust and moisture during installation and daily service.

Containerized shipment

Units are packed and secured for sea transit, with packing prepared to international transport requirements.