Factory capability
Guanghong runs structured assembly and electrical testing on every unit, with production scaled to match commercial fleet and distributor volumes for overseas buyers.
Inspection protocol
01
Incoming power modules, controllers, and connectors are checked against specification before entering assembly.
02
Units are built to a documented sequence, with torque, wiring, and enclosure fitting recorded at each step.
03
Each charging station is run through electrical checks to confirm output behaviour and protective functions.
04
Completed units undergo extended operating tests before release, so shipments leave verified and ready to install.
Export readiness
Hardware, enclosures, and packing are prepared for long-term outdoor and commercial use and for containerized international shipment.
Components are selected and tested for stable operation across the temperature and humidity ranges typical of commercial charging sites.
Housings are assembled to protect internal electronics from dust and moisture during installation and daily service.
Units are packed and secured for sea transit, with packing prepared to international transport requirements.
Notifications